Although this work is tedious, it is necessary and very time consuming. The past two days, with Ed and Brad out of town, I've been waterproofing the floor of the upstairs area in the barn. When the wind blows, although this area is under the roof, the rain will blow in. As a result of my work, the dry/heated area in the barn will have the equivalent of two roofs. This photo is the waterproofing after two coats. I have two to go, both of which will now have grit in the mixture to provide a nonslip surface.
So, my days are paint on the waterproofing; wait 4 to 6 hours; paint on more; wait; paint on more; wait.
In the previous post (Steady Progress ) you can see another picture of the waterproofed deck.